My company is looking into redesigning our production routes to be setup at the Resource Group level, instead of just a single Resource. Currently, for any production item, we designate a single resource on a route, and if there are multiple resources that item could run on, we have separate routes created for each resource. Ideally, we would be able to create a single resource group that contains all of these possible resources for that item, and then create a single route that is set at the resource group level. The problem we run into is that this same item will run differently on each of the different resources, some faster, some slower. In our routes, we have been using the "times" section to designate the throughout, using "Process Quantity" field as the pounds per hour that we are able to run. The issue we are running into now, is that we are only able to set this field at once value for the entire route, despite using a resource group.
Does anyone have a suggestion on how we can setup our routes to use Resource Groups for the primary operation, while also having the flexibility to have different process quantities depending on which resource in the resource group gets selected?